support@w4writers.com +44 7743 307695
Apr 05, 2023

Module code :- EG7034
Module title :- Mental Wealth Engineering Management and Project Organisation
Assignment number :- 1
Weighting :- 100%
EG7034 Engineering Management Assignment – UK.

1. Assessment for Module
As in the real world you will be dealing with ambiguous and un certain situations and information. You will need to manage, mitigate and justify any assumptions according to your best professional under standing. You must deliver to your client a professional report that addresses their concerns and puts forward your suggested outline design / action plan with ways to implement that plan. It is important to remember that you are acting as a professional consultant and must put forward what you believe to be the most appropriate solution remembering you have a professional duty to society which may be contrary to your client’s needs.

This assignment will expect you to work closely in your student teams to collaborate and produce the desired module outcomes. It will also involve you undertaking detailed individual research and exposition. There are three parts to the assessment of this module and they are included in this one assignment in three main parts:

1. Collaborative/ Group Feasibility Presentation 20%
2. Group Case Study, with individual student section – 60% weighting
3. Individual Mental Wealth Reflective Log. – 20% weighting

EG7034  Engineering Management & Project Organisation Assignment-East London University UK.

The technical issues will be covered in parts (1) and (2) and your professional ability to manage yourself and the group work will be demonstrated in the Reflective Log (3).

If you under go difficulties in your group or individual work these will need to be explained and justified in your Reflective Log in the correct format as you will be assessed on how well you have coped with managing change during this work – See Part C : Reflective Log and Summary Report’ for details below.

2. Overview of Assessment

2.2 Management and Monitoring Progress
The assignment will consist of five team members in which you will responsible for one task each but ultimately the whole project must be joined up. Preparing students to engage with a variety of people in the work place. It is not always possible to work with close friends in industry but the ability to work as a team and meet deadlines on time this is par amount. It is advis able for the group to meet weekly to plan work and report on progress Keep a log of all the challenges that you face as both a group and an individual and reflect upon this in your Reflective Log.

All your collaborative group work needs to be uploaded and documented using MicroSoft© Teams platform and used as evidence for your Reflective Log. Details of how to access this will be provided.

3. Project Brief – The Millennium Mills Redevelopment
Cities across the world are already feeling the effects of the climate crisis and need to ensure that they are resilient to a future which could result in a variety of change able weather such as more powerful rainfall events, higher temperatures and sea level rise.

This means that all new developments need to be designed to be resilient in an uncertain world in 2050 to ensure that the people living working and visiting there are safe healthy comfort able and productive. Silver town Quays in London’s Royal Docks is a water side site which will be developed over the next 10-15 years and needs to be designed to be 2050-ready.

EG7034  Engineering Management Assignment – UK.

The client has already received several proposals regarding the refurbishment and re construction of the Mills but remain unsatisfied about these proposals. Details of the context and background to the Millennium Mills can be found in the Appendix A

Your team is an engineering consultancy company and have been commissioned by the lead developer Lendlease to carry out a feasibility study and outline design for the re development of the Millennium Mills located on the southern side of the Royal Victoria.

Dock and associated infrastructure. You will be considering plot 4 for the construction of a new building to facilitate the client’s requirements set out below. Basic details site plans are provided on the Moodle site for EG7034 with further documentary details and materials accessed on line form the New ham London Borough Planning Portal.

Project requirements
Lendlease are looking to you for answers as to how to achieve from the project the most appropriate:
• Sustainable approach to design that will provide long term benefit to the local and wider area of East London.
• An integrated infrastructure strategy and improved access and transport links for the local people and businesses.
• A strong commercial strategy & evidence that the development with be financially viable and meet its legal requirements.
• Demonstrate that they meet the needs of local and regional stakeholders and environ mental planning obligations
• A clear procurement strategy and safe construction programme
• A high quality development that show cases innovation and also provides value for money for the client and stakeholders alike.

This is broken down in more detail into five (I – V) sections in Part B of this assignment.

Part A – Collaborative Group Feasibility Presentation

3.1 Collaborative Group Feasibility Presentation – week 6
During weeks 3 – 5 you will undertake some practice presentation during your tutorial sessions on linked topics.
The Group Progress Presentation to be graded week 7 must cover the following areas:

An outline feasibility study:

• To compare three options listed below for plot 4 and reach a conclusion for the best use of the land.
o Commercial premises
o Leisure or cultural facilities
o Residential development.

Each proposed scheme must be supported by: –
o An artist impression of the building
o Floor plans
o Elevations

 

Recent Post

Order this Assignment now

Total: GBP100

fables template