Evaluate different types of construction information in the context of diverse project types.

Assignment – Construction Information Production

1. Construction Information; to include:
a. Site plan)
b. Floor plan
c. Elevations
d. Section
e. Detail(s)
f. Door and window schedules
g. Outline bill of quantities
h. Schedule of works
All drawings are to be on a minimum sheet size of A3. They should include a title block, showing project information, and be numbered using an industry standard.

Drawings should be produced using an industry standard CAD software package. BIM software may be used, but is not required.

1. Construction Information; to include:
a. Site plan)
b. Floor plan
c. Elevations
d. Section
e. Detail(s)
f. Door and window schedules
g. Outline bill of quantities
h. Schedule of works
All drawings are to be on a minimum sheet size of A3. They should include a title block, showing project information, and be numbered using an industry standard.

Drawings should be produced using an industry standard CAD software package. BIM software may be used, but is not required.

Learning Outcome 1: Evaluate different types of construction information in the context of diverse project types.
Learning Outcome 2: Develop construction drawings, details, schedules and specifications in support of a given construction project.
Learning Outcome 3: Interpret different types of construction information in order to explain a construction project.
Learning Outcome 4: Assess ways in which construction professionals collaborate in the production of construction information.

Assignment Brief

Your employer, a medium-sized general contractor, has been commissioned to design and build an office building. The design team within the company has prepared a set of outline design drawings, which provide general information about the proposed building, site and form.

You are tasked with the responsibility of preparing the construction information package that will allow the construction team to build the project. The package of information required includes the following:

• Site plan

• Floor plan

• Elevations

• Section/Details

• Door and window schedules

• Outline bill of quantities

• Schedule of works

Accompanying the construction information package, your employer wishes to understand your reasons for the drawings, specification and schedules that you have produced.