This assessment is designed to test your achievement of selected learning objectives 6, 7, and 8 corresponding to Modules 6, 7 and 8, respectively. In particular, the assignment involves estimation of hydrograph in a subcatchment outlet considering storage routing (module 6), urban design discharges (module 7) and yield analysis (module 8).
The assignment is divided into three parts:
Part A – Subcatchment storage routing
Part B – Estimation of Minor and Major design flows for a residential subdivision
Part C – Feasibility study of a proposed water supply dam (yield analysis)
Part A - Subcatchment Storage Routing
A. Consider a sub-catchment area of 6 km2 and its centroid is located at 28.3407 S and 152.3760 E. Extract the 1 in 100 AEP, 60-minute design storm data for the sub-catchment from the ARR2016 Design Rainfalls1. Extract the temporal pattern (EventID 1991) from the sub-catchment and generate a table showing the 5-minute time interval design rainfall intensity.
B. The initial and continuing loss (IL-CL) data across Australia is discussed in the ARR 2016 Book 5 – Flood Hydrograph Estimation (Ch 3 Losses)3 . The recommended IL (mm) and CL (mm/hour) value across Australia can be found in Figure 5.3.18 and Figure 5.3.19, respectively in ARR 2019. Consider that the subcatchment is located in South East Queensland and the recommended IL is 20 mm and CL is 2 mm/hour. Using the 5- minute intervals design rainfall data estimated for the subcatchment (1?P, 1 hour), catchment area of 6 km2 , and the recommended IL = 20 mm and CL = 2 mm/hour, you need to perform the following tasks:
a) Provide a table (as shown below) showing the 5-minute rainfall depths (mm), cumulative rainfall (mm), IL or CL applies, 5-minute rainfall excess depths (mm) using the recommended IL-CL values and 5-minute rainfall excess intensity (mm/hour). What is the volumetric runoff coefficient in %?
b) Convert the 5-minute rainfall excess hyetograph to a subcatchment instantaneous discharge hydrograph (in m3 /s) using Equation 6.1 provided in the Study Book (section 6.3.2, page 14). You need to provide:
1. A table showing the 5-minute rainfall excess intensity (mm/h) and subcatchment instantaneous discharge (m3 /s), and
2. A figure showing the rainfall excess hyetograph (time step vs rainfall intensity in mm/hr) and the instantaneous hydrograph (time step vs discharge in m3 /s).
c) Perform a subcatchment storage routing using Equations 6.2 – 6.8 provided in the Study Book (section 6.3.3, pages 16-18). You may assume that at the beginning of storm (time is zero) both storage and sub-catchment outlet discharge are zero. You need to provide:
1. A look-up table showing the relation between discharge (Q in m3 /s), storage (S in m3 ) and [2S/Δt + Q] in m3 /s. In order to develop the Look-up table, you can assume a series of Q values, and then estimate storage S (using equation 6.2, c = 1.6) and [2S/Δt + Q]. You can provide the first few rows of the look-up table in the report, and keep the long look-up table in the excel file.
2. A table showing your subcatchment routing estimation as shown in Table 6.7 (Study Book).
3. A figure showing the inflow (instantaneous) and subcatchment outlet hydrographs.
4. Report the attenuation (reduction of peak in m3 /s) and translation (lag in time unit).
Part B – Minor and Major Design Discharges
3.1 Proposed residential subdivision
A drainage scheme is to be designed for a residential area located in Brisbane, Queensland. A schematic subdivision layout plan is shown in Figure 3.1 (collected from iplan4 ). Contour lines (0.5m interval) are shown in the subdivision plan. The subdivision includes 17 lots (numbers 801-816 and 900) and a 20m wide new road as shown in the plan. After development, the fraction impervious of the lots will be 0.3. It is assumed that the pavement width in the proposed new road is 10 m. The road crossfall is 1:40 [vertical 1, horizontal 40] one-way. The road will have a 200 mm high vertical kerb and a 0.45 m wide gutter having a crossfall of 1:10. The kerb and gutter is provided in one side of the road. The drainage scheme includes five on-grade Pits (P1 to P5) as shown in the plan. Pits and their catchments are provided in Table 3.1.
Your task is to prepare a Minor system design check of the stormwater system upstream and including Pit 5 (P1 to P5) based on the preliminary layout shown in the plan and then a Major flood hazard check in the road just downstream of Pit 4 (P4). The Minor system is to cater for the 2 year ARI storm and the Major system for the 100 year ARI storm. The system includes drainage pipes (Pipe 1-2, Pipe 2-3, Pipe 3-4 and Pipe 4-5).
Use the following information:
Part C – Feasibility Study of a Proposed Water Supply Dam (Yield Analysis)
Oakey is a rural town in the Darling Downs region of Queensland, Australia. It is situated 29 kilometres west of the regional city of Toowoomba. The population of Oakey is about five thousands. Oakey has been supplied with water from the Mt Kynoch Water Treatment Plant since the commissioning of the Toowoomba-Oakey pipeline in December 1997. In order to augment the water supply security in the Oakey town, a proposal has been submitted to the Toowoomba Regional Council to construct a dam (reservoir capacity is 150 ML when full). The preliminary location of the Dam is near to the Gowrie Creek at Oakey (site number 422332B). When full, surface area of the reservoir is 18,000 m2 and the maximum volume is 150,000 m3 . The Toowoomba Regional Council has engaged you to provide them a preliminary feasibility study report to justify this plan. Therefore, you are requested to perform a daily yield analysis for the year 2023 (365 days). As a preliminary feasibility study, you are requested to estimate a maximum daily water demand (in ML/day) that can be diverted (or extracted) from the reservoir with a reliability of 99%.
Why does inflation make nominal GDP a poor measure of the increase in total production?
Read MoreWhat group therapy techniques were demonstrated? How well do you believe these techniques were demonstrated?
Read MoreBudgeting is an important activity within every healthcare organization. The particular challenges encountered, however, can vary depending on the type of organization.
Read MoreNHSFPX4000 Developing A Health Care Perspective, Nursing
Read MoreWould it be ethical to try to accommodate all 15 passengers, or would it be ethical to exclude one or more passengers from access to the lifeboats?
Read MoreHumanities Question-How is social class and youth sport represented in the film? Is the concept of meritocracy validated?
Read MoreExplain what strategies you will use to handle compassion fatigue so that it doesn’t become an ethical issue.
Read MoreLaw Question-Write an opinion about the case as a Supreme Court Justice.
Read MoreModule 13: Concept Maps: Replies & Reflection-which of the other maps you like best and why you like it (provide the first and last name of the classmate who submitted the map you like best)
Read MoreBusiness Question-How will the company differentiate its product from the competition?
Read More